Thursday, 10 April 2014

What a difference a week makes!

It's only six days, actually, but the guys have certainly made great progress since our last visit.  As we hoped, the walls have been built up to first floor level and most of the beam and block first floor has been installed.  The space for the master bedroom looks really vast although the toilet and bathroom will need to be taken out of it. We can now start to see how the levels are lining up in practice and how the access from the master bedroom to the garden will work. 


Beam and block first floor in place
 The ground floor bedrooms look as though they will be a decent size, too, and there is room for slightly larger windows (i.e. above ground level) than we expected.


This will be bedroom two